PPMP20009 Leading Lean Projects XXXXXXXXXXTerm 2, 2019 Page 1 of 5 PPMP20009 Leading Lean Projects Assessment 1 Specification Individual Assessment (40%) Due Date: 23:55 AEST Week 9, Friday (20...

1 answer below »
PPMP20009 Leading Lean Projects XXXXXXXXXXTerm 2, 2019
Page 1 of 5
PPMP20009 Leading Lean Projects
Assessment 1 Specification
Individual Assessment (40%)

Due Date: 23:55 AEST Week 9, Friday (20 September, 2019)
Length: 2500 – 3000 words (excluding references and appendix)
Case: Implementing lean project management to build your dream home.
Introduction
You have taken up a new job in Perth, Western Australia. Both your partner and you are very
keen on wanting to build your own home. You come across the Keystart initiative
(https:
www.keystart.com.au/) by the government of Western Australia and have found out
that you and your partner are eligible to apply. You have decided to submit an application, but
will have to do the following:
• Identify the subu
you want to build and decide the land size you want to buy (this
will depend on the budget you are willing to spend on the land)
• Research the market and identify potential home builders who will construct your
dream home.
• Finalise the layout /design and agree on the cost to build the house with the chosen
uilder
• Enter into a deal
o Sign a land contract with the land developer – you will need to pay a deposit of
AUD$2000
o Sign a Pre-Work Construction (PWC) contract with the builder - you need to
pay a deposit of AUD$2000
(in both contracts you have inserted the following clause: Deposit to be returned to
client (in full) in the event of failure to obtain finance approval).
• Finally, you are now ready to submit an application to Keystart (can be done through
the builder) to obtain finance to build your dream home.
The above activities can be efficiently managed through key project management processes.
Where possible, you can also aim to implement lean project management principles to
successfully manage the above activities.
Assessment
1
https:
www.keystart.com.au
PPMP20009 Leading Lean Projects XXXXXXXXXXTerm 2, 2019
Page 2 of 5
This assessment is to be done INDIVIDUALLY.
Your tasks:
Answer the following questions:
1. Select and explain the project management processes (either from PMBOK or
PRINCE2 or a combination of any best practices you have learned in this unit) that
can help you:
a. Choose the subu
and decide the land size
. Chose the best builder
c. Identify the stakeholders for the project
2. What are the factors that will influence the design and layout of your dream home?
Explain the project management processes you used to determine the design/layout.
3. Explain how you would implement lean best practices to achieve lean project
management for (1) and (2) above.
Marking Criteria:
Your assignment will be assessed on the extent and quality to which it meets each of the
following criteria:
No Attributes (%)
1 Co
ect project management processes are selected and explained in detail for
the following:
a) Choosing the subu
3
) Deciding the land size to buy 3
c) Choosing the best builder 5
d) Identify the stakeholders for the project 5
2 a) Factors that will influence the design and layout of your dream home
are thoroughly discussed
5
) Project management processes that are used for 2(a) are explained in
detail
5
3 Detailed explanations are provided to achieve lean project management for this
initiative.
10
4 Clarity of expression, grammar, spelling and co
ect APA style referencing 4
Total 40
Reminder:
Assessment Due Date On or before 23:55 hrs AEST Week 9, Friday (20 September, 2019)
Type Individual
Weighting 40%
PPMP20009 Leading Lean Projects XXXXXXXXXXTerm 2, 2019
Page 3 of 5
Important Information
Formatting. The writeup should be presented in 1.5 line spacing, 12 point Times New Roman
font. Answer each question with proper heading (see below):
1a) The choice of the subu
was based on ….Several project management processes were used
……
1b) The land size was decided based on….
1c) …….
1d) …….
2a) …….
3) …….
This assessment item involves researching your assigned topic to enhance your understanding
of lean project management concepts and utilisation of academic literature. Whilst you use the
ecommended textbooks and lecture materials, you may also refer to relevant peer reviewed,
academic journal articles. A reference list formatted in the prescribed APA style is compulsory.

General Assessment Criteria
Incomprehensible submissions. Assessments provide the opportunity for students to
demonstrate their knowledge and skills to achieve the required standard. To do this, assessment
esponses need to be both clear and easy to understand. If not, the University cannot determine
that students have demonstrated their knowledge and skills. Assessments will, therefore, be
marked according to the marking criteria (accompanied by the marking ru
ic). Failing to meet
the requirements may result in 0 (zero) marks where relevant.
Do not reproduce statements from PMBOK or PRINCE2 or any other references
without proper context.
Example 1:
Leadership is knowledge, skills, and behavior required to guide, motivate and direct a team to
achieve its business goals (copied from page 56 of PMBOK), as this is considered plagiarism,
instead you must show how you would apply that statement to your case.
Example 2:
PMBOK version 6 constitutes 10 knowledge areas, 5 process groups and 49 process activities
or PRINCE2 consists of 7 Principles, 7 Themes and 7 Processes.
PPMP20009 Leading Lean Projects XXXXXXXXXXTerm 2, 2019
Page 4 of 5
Produce your answers for the case in question. DO NOT write about the theory or
explain what PMBOK, PRINCE2, DMAIC methodology, etc covers. That will not
attract any marks. You should demonstrate the application of the best practices not the
theory.
Discuss with your lecturer / tutor if you need help.
Word count limit (excluding references and appendix). Your submission should be made
using a Microsoft WORD document of 2,500 - 3,000 words. Text length less than 2500 words
will be penalised by 5% of the total available marks while text beyond the 3000 word limit will
attract a penalty as follows:
• XXXXXXXXXXwords: 5 marks
• XXXXXXXXXXwords: 10 marks
• more than 3601 words: 15 marks
Late penalty. Late submissions will attract penalties at 5% for each calendar day or part thereof
that it is late of the total available mark for the individual assessment item. This means that, for
an assessment worth 40 marks, the mark that you earn is reduced by 2 marks each calendar day
that the assessment is late (including part-days and weekends). See s4.58 in the Assessment
Policy and Procedure (Higher Education Coursework).
Check with marking criteria. Before submitting your assignment you should check it against
the assessment criteria and the marking ru
ic included in this specification to ensure that you
have satisfactorily addressed all the criteria that will be used to mark your assignment.
Academic language. All submissions should be thoroughly proof-read for spelling,
typographical or grammatical e
ors before being submitted. Do not reply on the ‘spell-check’
function in your word processing program. If, for example, ‘affect’ is substituted for ‘effect’,
your program may not detect the e
or.
Academic Integrity
All assignments will be checked for plagiarism (material copied from other students and/or
material copied from other sources) using TurnItIn (TII). If you are found to have plagiarised
material or if you have used someone else’s words without appropriate referencing, you will
e penalised for plagiarism which could result in 0 (zero) marks for the whole assignment. In
some circumstances a more severe penalty may be imposed. The link to the University’s
Academic Misconduct Procedures is available in the unit profile.
Useful information about academic integrity (avoiding plagiarism) can be found at:
CQ University referencing guides
https:
www.cqu.edu.au/student-life/services-and-facilities
eferencing/cquniversity-
eferencing-guides
PPMP20009 Leading Lean Projects XXXXXXXXXXTerm 2, 2019
Page 5 of 5
Submission requirements
You will see a link for submission of Assignment 1 in the Dashboard page and also in Week
9 for this unit in Moodle.
IT IS YOUR RESPONSIBILITY TO CHECK AND NOTIFY US IF YOU HAVE ANY
ISSUES WITH THE SUBMISSION LINK FOR ASSESSMENT 2.
No Zipped files. Students must NOT zip the MS Word document or submit it as one single
zip/compressed file.
Means of submission. All assignments must be submitted electronically in Moodle. The
submission links can be accessed through the Assessment block on the Moodle unit website.
Physical copies/Email submissions are not accepted.
Auto-submission. Moodle implements an auto-submission process for those items uploaded
and left as drafts before the original deadline. However, any assessments uploaded after the
original deadline must be manually submitted by the students.
Please note that auto-submission process does not work for assessments which have extensions.
Auto-submission only works where the original deadline of an assessment has not changed. If
you are submitting after the deadline (original or extended), you must complete the Moodle
Answered Same Day Sep 02, 2021 PPMP20009 Central Queensland University

Solution

Amar answered on Sep 16 2021
143 Votes
1
Running Header: Implementing Lean Project Management – Building of Dream Home
2
Implementing Lean Project Management – Building of Dream Home
Implementing Lean Project Management – Building of Dream Home
[1 A] The subu
identified for purchasing the land as well as the size of the land purchasing this dream home is as follows – Gosnells, a subu
of Perth, WA and the size of land has finalized as 289 Square Meter. The PMBoK framework has been employed in the context of this project management and the specific project process that has been employed for identification of the subu
and the size of land in the subu
that is finalized to be purchased shall entail the project procurement process, and in specific the following – planning of the procurement management (with respect to subu
identified and land to be purchased), conducting the procurements, and controlling the procurement (PMI, 2017; Mullaly & Thomas, 2016; Todorovic et al., 2015; Lientz & Rea, 2016). The process of procurement planning shall entail the preparation of procuring of land (and which specific subu
) related statement for work or else the terms for reference, preparing of higher levels of cost estimate (in terms of maximum limit for being Keystart initiative eligible) for determining the overall project budget, advertising the need for this opportunity by way of online platforms and real estate agents, identification of the shorter list comprising the land which is available for sale that meets the requirements and qualifications, preparing as well as issuing of the relevant documents (PMI, 2017; Mullaly & Thomas, 2016; Todorovic et al., 2015; Lientz & Rea, 2016). preparation as well as the submission of proposals from the concerned sellers and agents, conducting technical / regulatory levels evaluation concerning the available for sale lands including their respective quality, performance of the cost-based evaluation concerning the sale related proposals, preparation of finalized combined quality as well as cost related evaluation for selecting the finally decided sale deal, and finalizing of the negotiations as well as the signing of contract in-between project team and the land seller (PMI, 2017; Mullaly & Thomas, 2016; Todorovic et al., 2015; Lientz & Rea, 2016). It has to be noted that requirements pertaining to terms of project shall in a significant manner influence overall strategy at time of undertaking planning with respect to the land procurement related process. The decisions which are made to develop the plan for this land procurement management could in addition have influences over project schedule as well as be integrated schedule development and budget estimation (PMI, 2017; Mullaly & Thomas, 2016; Todorovic et al., 2015; Lientz & Rea, 2016). The conducting of procurement process for this project shall entail obtaining of the responses from sellers who’s land is of interest to the objectives of this project, selection of the specific seller, as well as signing of the contract (PMI, 2017; Mullaly & Thomas, 2016; Todorovic et al., 2015; Lientz & Rea, 2016). The core benefit concerning the said process shall be that it shall aid in the selection of seller who is qualified as well as finally implement relevant legal agreement to take ownership of the land. This end outcome concerning this process shall be established agreements inclusive of the formal contracts. The controlling of procurement with this project shall entail the management of procurement related relationships, monitoring of the contract performances, as well as making the changes as well as co
ections in the appropriate manner as well as closing out the contracts (PMI, 2017; Mullaly & Thomas, 2016; Todorovic et al., 2015; Lientz & Rea, 2016).
[1 B] The builder identified for undertaking the building of the dream home in the subu
and the land identified include project procurement process, and in specific the following – planning of the procurement management (PMI, 2017; Mullaly & Thomas, 2016; Todorovic et al., 2015; Lientz & Rea, 2016). The process of procurement planning shall entail the preparation of statement for work with respect to the building of home as per the expected features and within the planned budget as well as the terms for reference, preparing of higher levels of cost estimate for determining the overall project budget, advertising the need for this opportunity by way of online platforms and with inputs from experts, identification of the shorter list comprising the builders which is available in various platforms who shall meet the requirements and qualifications, preparing as well as issuing of the relevant documents (PMI, 2017; Mullaly & Thomas, 2016; Todorovic et al., 2015; Lientz & Rea, 2016). Preparation as well as the submission of proposals from the concerned builders, conducting technical / regulatory levels evaluation concerning the ability, and experience of the builders including their respective quality, performance of the cost-based evaluation concerning the sale related proposals, preparation of finalized combined quality as well as cost related evaluation for selecting the finally decided sale deal, and finalizing of the negotiations as well as the signing of contract in-between project team and the finalized builder (PMI, 2017; Mullaly & Thomas, 2016; Todorovic et al., 2015;...
SOLUTION.PDF

Answer To This Question Is Available To Download

Related Questions & Answers

More Questions »

Submit New Assignment

Copy and Paste Your Assignment Here