Objectives This assessment requires you critically analyse the system design process of a project using the theory and principles studied during the course. This assessment item relates to the course...

1 answer below »
Objectives
This assessment requires you critically analyse the system design process of a project using the theory and principles studied during the course. This assessment item relates to the course learning outcomes 1 to 5.
Background
Chapters 1-3 of Blanchard and Fa
ycky
Details
In this group assessment, you are required to write a report which critically analyses the conceptual design phase of a systems engineering project. Projects might include designing a
idge, a dam, an environmentally-conscious building or a mechatronic system. You might not have been involved in the project personally, but some connection with the project would make the analysis more meaningful. Choose your project carefully because in assignment 2, your group will need to analyse the preliminary design and detailed design phases of the project. If you are unsure as to whether your chosen project has sufficient depth/detail, consult with your tutor. You will also have the opportunity to work on the assignment in the tutorials for the unit. Every group must do a different project. Also, projects from previous years can not be reused.
The report is to  analyse the following phases of the project:
· Needs definition
· Conceptual system design
To demonstrate your research skills and understanding, the report must draw upon relevant sources like journals, books or reputable trade publications in analysing the project. You must also present the case study in terms of the above two lifecycle phases and evaluate the proposed conceptual design against the identified needs / requirements.
Format
The report is to follow the format given below:
· Title Page
· Table of Contents.
· Introduction
· Needs definition
· Conceptual design
· Evaluation
· References
You are expected to use the Harvard Referencing style for the Report.
Length
The 2000 (±10%) word length includes only the Body of the Report. It does not include the Title Page, Table of Contents, the reference list or any appendices.
Assessment Criteria
1. Introduction (5 Marks)
2. Needs definition (10 Marks)
3. Conceptual design (10 Marks)
4. Evaluation (5 marks)
5. Research skills (5 marks)
6. Grammar and spelling (5 Marks)
Weighting: 20%
Groups
The group size is to be 3, although variations may need to be made by the tutor depending on the class size. Students are encouraged  to form their own groups, select a topic and notify their tutor of their decisions before the end of Week 2. Any students unallocated at the end of week 2 will be allocated to groups by their tutor. All members of a group must be in the same tutorial group. If group conflict arises, discuss the matter with your tutor in the first instance and as early as possible. If necessary, groups may be split. 
Submission
One report per group is to be submitted via Moodle as a Microsoft Word file. Make sure that you are aware of CQU's plagiarism policy and how it applies to group assignments.
Answered Same Day Aug 14, 2020

Solution

Sangeeta answered on Aug 20 2020
165 Votes
Project on Phantom DJI Drone 5X
Contents
Introduction    3
Conceptual Model for Phantom DJI Drone 5X    4
Evaluation    6
Gantt Chart    7
Conclusion    8
References:    9
Introduction
In this era of intense globalisation and market competition, every task is a project; be it renovating a building or organising an event. According to Yvonne (2006), a project can be defined as non-routine, complex and a budget, time and resource restricted effort with a specific set of guidelines to meet end goals. It is basically a temporary endeavour, applicable to all industries and markets for creating a unique and differentiated product or a service. The strategic objective is to attain long term competitive edge. Every project implies a specific timeframe, unique specifications, a set budget and cross border functioning (Yvonne, 2006). Similarly, project management can be described as an organised approach or a technique to managing any project. It includes time, resource and budget costing in addition to analysis and planning of activities (Yvonne, 2006).
As part of the course cu
iculum, the work would be ca
ied by a team of five members on a given project. The project involves conceptual model for Phantom DJI Drone 5X. The new Phantom 5X basically outlines an OcuSync HD transmission system that effectively supports automatic dual-frequency band switching as well as connects with DJI Goggles wirelessly. Just like the Phantom 4 and Advanced, the Phantom 4 Pro has 1-inch 20-megapixel sensor proficient of shooting 4K/60fps video as well as Burst Mode stills at around 14 fps (Phantom DJI Drone, 2018). Additionally, its Flight Autonomy system takes in dual rear vision sensors along with infrared sensing systems for about 5 different directions (Phantom DJI Drone, 2018). Taking a step ahead, the remote controller of Phantom 5X makes use of OcuSync video transmission that effectively adopts time-division multiplexing method for sending control signals and receiving video signal at the same time. When the power of the controller is switched on, the OcuSync system effectively scans for checking the frequency band having least interference and switches accordingly for maintaining proper transmission (Phantom DJI Drone, 2018). Additionally, thanks to OcuSync, the Phantom 5X wirelessly easily connects with DJI Goggles. With no cable constraints, one could enjoy stimulating FPV flight at speeds of around 72kph (45mph) within S-mode (Phantom DJI Drone, 2018). Planning and right resource alignment is extremely important for success of any project. Likewise, in our project we ensured that a plan was laid before starting any task (Lewis, 2006). Moving ahead, the chief purpose of this paper is basically to provide a conceptual design for Phantom DJI Drone 5X along with evaluation of the same. For doing few technical changes would be required in the already existing model of Phantom DJI Drone. The entire process of enhancing the present Phantom DJI Drone would require several steps as well as adequate resources. As a result, through means of this paper an attempt has been made to develop a project report for the enhancement of features of Phantom DJI drone 4 Pro.
Based upon the skills and experience, all five team members would be assigned individual roles and responsibilities. According to Lewis (2006), right allocation in a team helps avoid underutilisation and overutilization of resources. The strategic aim was to organise the team in a manner to best manage, plan, control and close out Phantom DJI Drone project 5X. From technology perspective, MS Project would be used to develop a detailed project plan focusing upon cost model and vendor selection. The idea is to map cost with the allocated resources.
Conceptual Model for Phantom DJI Drone 5X
Activity definitions