Suppose the scope Triangle was modified as follows, Resource availability occupies the center and the three sides are scope, cost and schedule. Interpret this triangle as if it were a system in...

1 answer below »

Suppose the scope Triangle was modified as follows, Resource availability occupies the center and the three sides are scope, cost and schedule. Interpret this triangle as if it were a system in balance. What is likely to happen when a specific resource on your project as concurrently allocated to more and more projects. As a project manager how would you deal with these situations.

-In your answer include an introduction and a conclusion.

Answered 110 days After May 24, 2022

Solution

Pankaj answered on Sep 11 2022
74 Votes
Assignment: 110325
Introduction:
The project management (PMs) triangle is a visual tool or model that illustrates the project management constraints.
1. Time Constraint: A project is divided into the tasks that must be completed as well as the connections between each work.
2. Cost Constraint: It is common practise in accounting to divide costs into fixed and variable costs. Some costs may be expressed with precision, while others are more of an estimate.
3. Scope Constraint: A project's scope is a formal declaration of the results it is expected to produce.
This Triangle is now a widely used tool among project managers and offers a useful structure for the PM process. If you modify one side of the triangle model, the other two change as well.
As a Project Manager, how would you deal with these situations?
The triangle serves as an illustration of how modifying one...