Part 1 - Using the Microsoft Project files that you updated for Assignment Module 4, add resources to your project using the resources sheet. Please define all type of resources including Work,...

1 answer below »

Part 1 - Using the Microsoft Project files that you updated for Assignment Module 4, add resources to your project using the resources sheet. Please define all type of resources including Work, Material and Cost. At a minimum, complete the following fields for each human resource: Resource Name, Type, Initials, Max, Std. Rate, Base (Calendar). You can choose to use role names or birth names. For other resource types, complete Cost/Use. Once the resources have been added to the project file, assign those resources to the tasks that you defined in the project schedule. Multiple resources can be assigned to the same task. Resources should not be assigned to summary level tasks.


Part 2 - From this, create a separate Excel Spreadsheet that is a RACI chart - List at least 20 of the high-level summary tasks and then across the top all the key resources (at least 10). Put an R, A, C, I in the spreadsheet for each of the roles - leave blank those roles that have nothing to do with the activity. Use RACI or Responsible, Accountable (Decision maker, taking actions, Approver), Must Be Consulted, Informed only. Embed RACI Chart in your PMP.


Part 3 -Complete section 5 of the Project Management Plan Template.


Submit your PMP (with RACI Chart) and MS Project (mpp and pdf) file of your project with resource assignments.





RACI Tips:There will always be a R & A assigned to a task and more than one person can be responsible. There may not always be a C or I assigned to a task.

Answered 1 days After Sep 28, 2023

Solution

Banasree answered on Sep 29 2023
21 Votes
Responsibility Assign. Matrix
    Task/Resource    Project Mgr    Functional Manager    Sr. Analyst-1    Sr. Programmer     Quality Assurance    Configuration Manager    Programmer (2)     Independent Tester    Independent Consultant    Security Specialist    Documentation Specialist    Trainer    Acceptance Tester    Network Administrator    System Administrator    Database Administrator    UNIX System Administrato
    High Level Requirements    A    C    R    C    C    I    I    I    I        I         
    Detailed Requirements    A    C    R    C    C    I    I    I    I        I         
    Requirements Verification and Test    A    C    R    C    C    I    I    I    I        I         R
    Systems Design    C    A    C    C    C    I    I    I    R        I    I    
    Software Design    I    A    I    R    I    C    C    I    I        I         
    Hardware Design    I    A    I    C    C    I    I    I    R        I         
    Install Server Pilot COTS Hardware    A    I    I    I    C    R    C    C    C                 
    Install Server COTS Software    A    I    I    R    C    I    C    C    C                       I    I    I    I
    Build Custom Pilot Software    A    I    I    R    C    C    C    C    C                       I    I    I    I
    Conduct Pilot Subsystem Tests    C    I    C    I    C    I    I    R    C                  A    I    I    I    I
    Conduct Pilot System Tests    C    I    C    I    I    C    C    R    I                  A
    Design Pilot...