I need a good quote for my homework no 2 of 40 questions 5.0 points, so I need at least a good grade of 85 to 95. I need guarantee for my homework . I will appreciate your cooperation at tis matter....

1 answer below »
I need a good quote for my homework no 2 of 40 questions 5.0 points, so I need at least a good grade of 85 to 95. I need guarantee for my homework . I will appreciate your cooperation at tis matter. The textbook Surveying with Construction Applications by Barry F Kavanagh ISBN XXXXXXXXXX Thank You Bob
Document Preview:

Homework No2 Survey with Construction Applications :Questions Question 1 of 405.0 PointsLayout of highway curves:  A. is an approximation technique.B. should be approximated only in areas of dense vegetation.C. is a precisely calculated method of construction surveying.D. is similar to construction surveying of a parking lot or access road.Question 2 of 405.0 PointsThe calculation and layout of horizontal and vertical curves:  A. should be done only by experienced surveyors.B. is a basic fundamental for construction surveyors.C. should be done only by graduates of this course.D. is an intermediate level surveying technique.Question 3 of 405.0 PointsReal time surveying techniques typically are conducted using:  A. a transit and steel tape.B. a differential level.C. GPS or a motorized total station.D. a theodolite.Question 4 of 405.0 PointsThe word grade in construction work means:  A. a proposed elevation.B. the slope of profile line.C. cuts and fills.D. All of the aboveQuestion 5 of 405.0 PointsA route survey is typically prepared for the construction of a:  A. bridge.B. highway.C. store.D. federal post office.Question 6 of 405.0 PointsThe abbreviation BC in terms of a horizontal curve is the:  A. beginning of curve.B. beginning of construction.C. curve benchmark.D. back site of the curve.Question 7 of 405.0 PointsWhen staking or laying out a horizontal curve, the total station is typically set up at the:  A. beginning of curve.B. point of intersection.C. end of curve.D. long chord.Question 8 of 405.0 PointsAn uneven or abnormal symmetry observed following the stakeout of a horizontal curve is usually an indication of a:  A. spiral curve.B. curve embankment.C. surveying...

Answered Same Day Dec 23, 2021

Solution

Robert answered on Dec 23 2021
120 Votes
Homework No2 Survey with Construction Applications :Questions
Question 1 of 40
5.0 Points
Layout of highway curves:
A. is an approximation technique.
B. should be approximated only in areas of dense vegetation.
C. is a precisely calculated method of construction surveying.
D. is similar to construction surveying of a parking lot or access road.
Question 2 of 40
5.0 Points
The calculation and layout of horizontal and vertical curves:
A. should be done only by experienced surveyors.
B. is a basic fundamental for construction surveyors.
C. should be done only by graduates of this course.
D. is an intermediate level surveying technique.
Question 3 of 40
5.0 Points
Real time surveying techniques typically are conducted using:
A. a transit and steel tape.
B. a differential level.
C. GPS or a motorized total station.
D. a theodolite.
Question 4 of 40
5.0 Points
The word grade in construction work means:
A. a proposed elevation.
B. the slope of profile line.
C. cuts and fills.
D. All of the above
Question 5 of 40
5.0 Points
A route survey is typically prepared for the construction of a:
A.
idge.
B. highway.
C. store.
D. federal post office.
Question 6 of 40
5.0 Points
The a
eviation BC in terms of a horizontal curve is the:
A. beginning of curve.
B. beginning of construction.
C. curve benchmark.
D. back site of the curve.
Question 7 of 40
5.0 Points
When staking or laying out a horizontal curve, the total station is typically set up at
the:
A. beginning of curve.
B. point of intersection.
C. end of curve.
D. long chord.
Question 8 of 40
5.0 Points
An uneven or abnormal symmetry observed following the stakeout of a horizontal
curve is usually an indication of a:
A. spiral curve.
B. curve embankment.
C. surveying e
or.
D. high design speed.
Question 9 of 40
5.0 Points
An offset stake is installed:
A. after the point of intersection.
B. for use as an undistu
ed reference to a centerline stake.
C. one station after station 0+00.
D. when the surveyor uses GPS.
Question 10 of 40
5.0 Points
What is the distance that an offset stake is set from a centerline stake?
A. 2 feet
B. Half the distance from the beginning of curve to the point of intersection
C. 100 feet
D. The distance varies depending on the site
Question 11 of 40
5.0 Points
Offset stakes are installed to reduce the:
A. amount of construction staking necessary to maintain line and grade for
the highway centerline.
B. quantity of vertical curves in a highway survey.
C. size of horizontal curves on a rural highway construction.
D. engineer’s design workload.
Question 12 of 40
5.0 Points
Vertical curves are used in highway construction to provide a:
A. point of intersection between survey stations.
B. method to go over rivers and streams.
C. gradual change between two adjacent grade lines.
D. fun highway to drive on.
Question 13 of 40
5.0 Points
When staking out a vertical curve, the point of intersection is:
A. the instrument setup point.
B. a point unable to be staked, as it is an...