I have to submit 1200 words assignemnt. the question is reflection on any 3 tenders on civil projects around the world and it should the introduction of the project and problems faced when dealing the...

1 answer below »
I have to submit 1200 words assignemnt. the question is reflection on any 3 tenders on civil projects around the world and it should the introduction of the project and problems faced when dealing the construiction and how did they resolve it
Answered 1 days After Mar 22, 2021

Solution

Kuldeep answered on Mar 23 2021
148 Votes
Construction
Construction
Student Name:
Unit Name:
University Name:
Date:
Contents
Three tenders on civil projects around the world and it should the introduction of the project    2
Problems faced when dealing with the construction and how did they resolve it    2
Solution    5
References    7
Three tenders on civil projects around the world and it should the introduction of the project
Project Description: WestConnex will provide a 33-kilometer highway linking Sydney's west or southwest with the city of Sydney, Kingsford Smith Airport, or the Botanic Gardens port area. It will be built generally in the M4 or M5 co
idors as well as will also include a road about 15 km above the ground and a tunnel about 18 km, including a tunnel linked the two co
idors.
Project Description: The subway tunnel is under construction, which will untie the city loop, so more trains can pass through Melbourne more often. The subway tunnel will establish a novel end-to-end rail line from West Thornbury to Cranburn/Parknham in the southeast, which will be equipped with high-powered trains or new five underground stations. The subway tunnel will add capacity to the network, allowing more than one million extra passengers on the Melbourne train network to use the rail system during peak hours every week.
Project Description: The Bruce Highway upgrade plan is the largest road infrastructure project in Queensland's history. It aims to improve the protection, flood resistance, or traffic capacity along the width and length of highway among Cairns and Brisbane.
Problems faced by WestConnex, subway tunnel and Bruce Highway upgrade plan when dealing with the construction and how did they resolve it
There are a lot of probable pitfalls in life cycle of all three construction projects teners. The project manager task is to keep the site running safely and smoothly in the budget and plan. Sometimes it is a complex question (Narayanan and Huemann, 2021). A study shows that 98% of building projects are over-budget projects, or 78% of them have serious delays. Because, what are the reasons for these delays or holds as well as budget problems, and how should the project manager prepare? These are six typical challenges faced by building projects, and a few positive strategies to contain them.
1. Inadequate Risk Management
Usually, the project manager will take measures to prevent lasting threats. But, temporary problems are often excluded. These issues can roll in quickly moreover begin to have a major impact on the bottom line (WILKINSON, 2013). However it is subcontractors with unreliable results, conflicts in a
angements or the changing taste of stakeholders, some seemingly small problems can derail the project. Hence, it is significant to expand an emergency plan. Leave some swing space in the schedule and invest in safety training programs to ignor some potential problems.
2. Lack of Structure
Without a clear goal, it is not easy to complete the work efficiently....