TASK- PREPARE A STEP BY STEP PROCEDURE TO SUBMIT A DEVELOPMENT APPLICATION TO A LOCAL COUNCIL TO BUILD A 3 BEDROOM 2 STOREY RESIDENCE WITH AN IN-GROUND SWIMMING POOL ON A 1400 M2 BLOCK IN A BUSHFIRE...

1 answer below »
TASK-
PREPARE A STEP BY STEP PROCEDURE TO SUBMIT A DEVELOPMENT APPLICATION TO A LOCAL
COUNCIL TO BUILD A 3 BEDROOM 2 STOREY RESIDENCE WITH AN IN-GROUND SWIMMING POOL
ON A 1400 M2 BLOCK IN A BUSHFIRE ZONE
A) Research your own Councils requirements
B) Nominate the rules relating to that particular council.
C) Set out the procedure beginning with what is required (in the co
ect order) to submit the
application, what documents are required to support the application. Provide samples of the
documents.
D) Include what regulatory requirements are necessary.
E) Consider what is required if the application is rejected.
**Ensure you note where the information was obtained from and who the Author is for this
question.
** Include Contents Page
How to Write a Procedure
A Procedure is a step by step way of ca
ying out a task.
Be specific – point form is acceptable but must be in the co
ect order If you use the point form
system – always begin the section with a short preamble (only requires a sentence or two) outlining
what the general procedure is then follow with the relevant steps.
Include in the procedure -
1. WHO is responsible for each task
2. WHAT each task is
3. HOW each task is to be ca
ied out
4. WHEN each task is to be implemented.
You must include a copy of the relevant documents, when they are to be completed, by whom and
when.
Sometimes it is hard to know where to start. Set out your ideas in the following order:
Rules 1. DO’S List - your rules first (policies) regarding each phase/section of the
task
2. DO NOT List what must not be done
PROCEDURE Step by
Step tasks to ca
y
out the role
1 - Who is responsible
2 - What needs to be done first
3 - What needs to be next
4 - Now list how it is to be done
5 - In what timeframe is each step to be ca
ied out
6 - If it is applicable – nominate where the task should be ca
ied out OR
where information can be obtained
7 - If it is applicable – nominate how the process is to be recorded or
documented
SUPPORT
DOCUMENTS
1.List the co
ect document that must accompany each document
2. Provide an example of each document
3.YOU MUST INCLUDE SAMPLE DOCUMENTS –
OBLIGATIONS OF
THE PARTIES
1.PRINCIPAL, CONTRACTOR, SUPERVISOR, SUBCONTRACTOR, WORKER etc
2.Where applicable insert what each officer’s obligations are
CONTINGENCY List any ‘what to do if the wheels fall off’
REVIEW PROCESS 1.By Whom, When, Frequency
2.Report Process
3.Follow up
Answered Same Day Jul 13, 2021

Solution

Tanmoy answered on Jul 13 2021
138 Votes
PROCEDURE TO SUBMIT A DEVELOPMENT APPLICATION TO A LOCAL COUNCIL TO BUILD A RESIDENCE
Introduction
For setting up a building in and Australian council, the owner and the builders have to follow certain policies and guidelines. It is a simple process but has to be conducted in a step by step procedure for getting approval for constriction of building from the local council in Australia. The steps for building approval process from a local council are as follows:
1. Lodgement of Building application for approval: The process starts with the owner of the property lodging an application for approval of the building to the local council to obtain a building permit. Then the owner has to accept a fee proposal which is provided by the council. After which the owner needs to submit the building plans for assessment, application form duly filled with the supporting documents and fees to the building approval council.
2. Assessment of the building plan: the local council will assess the submitted plans and the supporting documents as per the guidelines of the local and state building codes and regulatory policies. Further on requirement of any other documentation, the owner will be asked to submit the same.
3. Issuance of building approval: Once the council approves the building plan, they issue a notice to the local council of the approval and their decisions. The documents are archived with the local council as well as sent to the owner.
4. Inspection process: The Council’s building approval department conduct a obligatory inspection for verification of the slab rate, footings and fire partition and upon satisfactory inspection issues Form 16s to the owner.
5. Completion of work and final certifications: Once the construction of the entire building is completed again an inspection is conducted by the council and upon satisfactory verification issues final inspection certificate F21 or F11. Thereafter, the local council, builder and the owner of the building are notified of the final inspection and the results of the building certifications.
Research
In this document we will discuss about setting up a two storey building with three bedrooms with an in-ground swimming pool on a 1400 M2 block in the bushfire zone of New South Wales in Australia. But, with the recent bushfire occu
ences in New South Wales, Australia in 2019, it took the lives of more than 33 people including four fire-fighters, engulfed 11 million hectares of land, bushes, parks and forest of Australia. As per an estimate by Professor Chris Dickman around 480 million animals were been affected by bushfire which started in September 2019. When it was the houses in the council of New South Wales, around five million hectares of land were affected destroying more than 2000 houses and forcing the residents to take shelter elsewhere. Considering the devastating effect of bushfire in New South Wales there has been certain modification in the existing building rules which needs to be adhered before construction of building in a bush fire zone in Australia.
Measures
The various measures that should be mandatorily undertaken by the builder and the owner...