A cast-in-place (CIP) cantilever wall is required to maintain the grade for a freeway. A preliminary wall dimension is shown in Figure P15.22. Determine the stability of the wall and show how you...

1 answer below »
A cast-in-place (CIP) cantilever wall is required to maintain the grade for a freeway. A preliminary wall dimension is shown in Figure P15.22. Determine the stability of the wall and show how you would provide adequate drainage. Use Rankine’s method to calculate the lateral forces. Neglect the passive resistance at the front of the wall.
Answered Same Day Dec 27, 2021

Solution

David answered on Dec 27 2021
100 Votes
Solution 4
Example 15.22
A cast-in-place (CIP) cantilever wall is required to maintain the grade for a freeway. A
preliminary wall dimension is shown in Figure P15.22. Determine the stability of the wall
and show how you would provide adequate drainage. Use Rankine’s method to calculate
the lateral forces. Neglect the passive resistance at the front of the wall.

Solution 15.22
1
3
0.5m
10°
Granular backfill
6m
2
Compacted sand
1.4m
0.7m
0.8m 0.7m 3m
In case of a wall with a vertical face;

1  cos   cos2   cos2  '   cos10  cos2 10  cos2 28 
KaR  K
 cos     cos10    0.38
pR
 cos   cos2   cos2  '   cos10  cos2 10  cos2 28 
   


K pR 
1
KaR

1
0.38

 2.63
PaR
Pax

1
(0.38)(18)(6  0.7  3 tan10)2  178.8 kN
2
 178.8 cos(10)  176.8kN
Paz  178.8sin(10)  31kN


W1
WS
W3
WS
W2

Table for weight calculation
Sr.no Weight(KN/m) Force(KN)
Vertical ...