Case Study Migrating Magento2 to Odoo
A wholesale company having offices in Sydney, Melbourne, Brisbane, Adelaide and Perth decided to use Odoo ERP for their various departments and operations such as inventory, sales, marketing, warehouse management, and IT etc. Previously, the company was using various custom-built smaller systems, or different software systems or lacy software systems. Cu
ently, their product inventory is maintained in Magento2. Transfe
ing all data from Magento2 to Odoo is a challenge!
However, the chief information technology officer came across a magneto-connector application for the Odoo ERP http:
odoo-magento-connector.com/index.html . He believes, that this connector application could be a potential solution. The IT department further investigation reveals that there could be possible problems such database fields or keys issue, data types mismatch, relationships between tables etc.
The Magentoerpconnector features and technical points are listed at the following link
https:
apps.odoo.com/apps/modules/8.0/magentoerpconnect
and its functions after installation are listed in the following link
http:
odoo-magento-connector.com/guides/installation_guide.html#after-the-installation
The chief information technology office has given you task to prepare a plan for the migration and prepare a quality assurance and testing plan. [Refer to assignment documents to create quality plan, test cases etc for this case study.]
Test Case Template
XXXXXXXXXXVersion 1.0
Company Logo
Test Case Template
Rough Draft (Version 1.0)
Prepared by:
XXXXXXXXXXDate:
Revision History
Date
Issue
Description
Autho
Date:
_______________________________
Tested by: ______________________
System:
______________________________
Environment: ___________________
Objective: ____________________________
Test ID _____________ Req ID ______
Function: _____________________________
Screen: _________________________
Version:
______________________________
Test Type: ______________________
(Unit, Integ., System, Accept.)
Condition to Test:
__________________________________________________________________________
__________________________________________________________________________
__________________________________________________________________________
__________________________________________________________________________
Data/Steps to Perform:
__________________________________________________________________________
__________________________________________________________________________
__________________________________________________________________________
__________________________________________________________________________
Expected Results:
__________________________________________________________________________
__________________________________________________________________________
__________________________________________________________________________
Actual Results: Passed h Failed h
__________________________________________________________________________
__________________________________________________________________________
__________________________________________________________________________
__________________________________________________________________________
Page 3 of 3