Topographical survey for a hydropower project shows that the available head is 100m. Design discharge for the river was 150m3/s. What would be the installed capacity (power in MW) of the power plant?...

1 answer below »

Topographical survey for a hydropower project shows that the available head is 100m. Design discharge for the river was 150m3/s. What would be the installed capacity (power in MW) of the power plant? What type of turbine should be used if turbine speed is 600rpm?

Answered Same Day Dec 22, 2021

Solution

David answered on Dec 22 2021
134 Votes
Topographical survey for a hydropower project shows that the available head is 100m. Design discharge for the river
was 150m3/s. What would be the installed capacity (power in MW) of the power plant? What type of tu
ine should be
used if tu
ine speed is 600rpm?
Solution
Available water...