Network Engineering / Systems administration Requirements Specification and Research Report on Candidate Technologies The purpose of a Requirements Specification document is to provide a thorough and...

1 answer below »

Network Engineering / Systems administration

Requirements Specification and Research Report on Candidate Technologies
The purpose of a Requirements Specification document is to provide a thorough and complete description of the requirements for your project. It should contain in detail specifics of any existing constraints as well as provide a detailed discussion of the business requirements, functional requirements and technical requirements. The purpose of the Research Report on Candidate Technologies is to provide an overview of candidate technologies that may be incorporated into your solution.You are required to submit the following:
  • Requirements Specification
  • Research Report on Candidate Technologies

Rationale

back to top

This assessment task will assess the following learning outcome/s:

  • be able to analyse and document requirements using appropriate modelling techniques and tools
  • be able to apply entrepreneurship skills and attitudes during the planning phase of a project
  • be able to evaluate and determine suitable technologies to be used in the project
  • be able to identify and analyse standard testing parameters used in evaluating system performance
  • be able to demonstrate effective communication skills.

Demonstrate student’s ability to analyse and document requirements using appropriate modelling techniques and tools. Demonstrate student’s ability to evaluate and determine suitable technologies to be used in the project. Demonstrate student’s ability to identify and analyse standard testing parameters used in evaluating system performance. Demonstrate effective communication skills.

Marking criteria and standards

back to top

Marking criteria - Network Engineering / System Administration Students

CriteriaHDDICRPSFL
Business requirements are correctly analysed and documented (6)All business requirements are correctly analysed and professionally documentedAll business requirements are correctly analysed and documentedMost business requirements are correctly analysed and documentedKey business requirements are correctly identified and documentedKey business requirements have not been identified
Functional requirements are correctly analysed and documented (5)All functional requirements are correctly analysed and professionally documentedAll functional requirements are correctly analysed and documentedMost functional requirements are correctly analysed and documentedKey functional requirements are correctly identified and documentedKey functional requirements have not been identified
Non Functional requirements are correctly analysed and documented (5)All non functional requirements are correctly analysed and documented to an industry accepted standardAll non functional requirements are correctly analysed and documentedMost non functional requirements are correctly analysed and documentedKey non functional requirements are correctly identified and documentedKey non functional requirements have not been identified
Technical requirements are correctly analysed and documented (5)All technical requirements are correctly analysed and professionally documentedAll technical requirements are correctly analysed and documentedMost technical requirements are correctly analysed and documentedKey technical requirements are correctly identified and documentedKey technical requirements have not been identified
Technologies that meet project technical requirements of project are identified, evaluated and documented (5)All technologies that are likely to have capacity to meet project requirements have been identified, accurately evaluated and professionally documentedMost technologies that are likely to have capacity to meet project requirements have been identified, accurately evaluated and professionally documentedKey technologies that are likely to have capacity to meet project requirements have been identified, accurately evaluated and professionally documentedKey technologies that are likely to have capacity to meet project requirements have been identified, evaluated and documentedEvaluation and documentation omits key technologies
Referencing of sources (APA citation) to reinforce findings (4)All written evidence is professionally communicated using correct referencing.All written information is good with appropriate referencing.All written information is generally well organised but more clarity of communication is required in terms of referencing.All written content is loosely connected, and there is ineffective use of referencing.No apparent logical order of written content, and there is a lack of referencing.

Answered Same Day Apr 03, 2021

Solution

Meenakshi answered on Apr 09 2021
134 Votes
Globex Corp Network System Upgrade
Contents
Executive Summary    1
Business Requirement    2
Functional and Non Functional Requirement    3
Technical Requirement    3
Technology Requirement    4
Technical Description for the Globex Company    5
Conclusion    5
Reference    6
Executive Summary
Our report objective is ,Globex company network that will be upgrade according to company requirement. The company main objective is to ,upgrade network that will address the reliable and secure VPN network and best suited topology is a mesh topology.
The Globex Corporation needed to upgrade the cu
ent network system , since the cu
ent network system does not meet the company cu
ent requirements therefore company decided to hired the network design company that will upgrade their network system .After the study and analysis to design a new network for them they hired our Virtucon Pty Ltd team. The objective of the project is to upgrade the network system. Our aim is to address the requirement for a secure and reliable network structure by designing a new network for Globex’s sites: Wagga Wagga , Griffith, and Albury.
The main aim of the project is to upgrade the network structure. Our aim is to address the requirement for a reliable network structure by designing an network for Globex’s offices: Griffith, Wagga Wagga and Albury. Globex Company main objective is enable easy and secure access services to the clients of the company, therefore they are going to upgrade the cu
ent system Our plan for the upgradation of the network is to host a cloud server. There are numerous companies those are providing cloud services given below
1)AWS,
2)Azure
3)Google Cloud services
Business Requirement
Globex System Problem
The cu
ent network system of Globex offices are not interconnected to each other and not supported many users. The Globex network system having problems regarding the data storage as they have not enough space for data storage and have no backup plans. The security of Globex Network System not well planned hence during the transaction of data may be goes wrong hand or may be lost. The company cu
ent network pose risk to the company's data integrity, reduces ability to deliver services on time and affect the efficiency. The cu
ent network is not efficient the machine fleet monitoring. The hacker may be hack the cu
ent network system and hack the information as the cu
ent system is not interconnected to each other therefore Globex Network System increases the unavailability of services when one office site server is down . Since cu
ent system having no data recovery plan, so that increase the chances loss of data and vulnerable to attack.
Functional and Non Functional Requirement
The company cu
ent network pose risk to the company's as given below
1) Data integrity
2) Reduces ability to deliver services on time
3)Affect the efficiency.
The cu
ent network is not efficient the machine fleet monitoring. Since the cu
ent network structure not meet the security standards, that probability of hacking the system is increase. The company would be trouble to recover after that disaster if any disaster will occur due to there is no plan for data recovery plan and system. Since...