Instructions
Critical Thinking 1- Managerial Accounting
**Before you begin, save this file to your computer named as LastName, First Name CTA1
Browned Butter Bakery has been baking coconut cookies for 27 years. Classify manufacturing costs, and prepare schedules for the Cost of Goods Manufactured and the Cost of Goods Sold for the month ended March 31, 2021. Requirements 1-4 all refer to Browned Butter Bakery.
Requirements
1.    COSTS: Use Excel to classify costs as described below.
a.    Classify the costs as either period costs or product costs.
i.    To classify the cost, click in the cell. A drop down a
ow will appear to the right. Click the a
ow and select either Product or Period.
b.    Classify the product costs as direct materials, direct labor, or manufacturing overhead.
i.    To identify the classification, click in the cell. A drop down a
ow will appear to the right. Click the a
ow. If it’s a product cost, select direct materials, direct labor, or manufacturing overhead. If it’s a period cost, select expense.
2.    COGM: Complete the Schedule of Cost of Goods Manufactured. Use the blue shaded areas for inputs. Use the following amounts:
Direct Materials 2,600
Direct Labor 3,200
Manuf. Overhead 10,450
Beg. WIP 1,800
End WIP 1,100
3.    COGM: Using the results from Requirement 2, calculate the cost per unit for goods manufactured. Use the blue shaded areas for inputs. Use a formula to calculate the cost per unit.
Units Manufactured 17000
4.    COGS: Complete the Cost of Goods Sold schedule with the below inventory data.
Beg. FG 650 units @ 0.96 per unit
End FG 1200 units
5. NerdzyCOGM: Continuing Problem. You will continue to see information on Nerdzy Computer Company throughout the course. Navigate to tab "Req 5- Nerdzy COGM" where you will read the relevant information on the company and then prepare a COGM.
Helpful Hints:
I highly recommend using the power of excel to your advantage (i.e. using cell references and formulas within excel). There are a few benefits to doing so. First, you will use Excel in industry regardless of your major, so it is great practice to start using it now. Second, using cell references minimizes chances of mistakes and allows you to quickly co
ect e
ors. Finally, it allows me to quickly see your calculations, which means I can award more partial credit than if I have to guess how you calculated something.
On each file you will find input areas that input areas that are shaded blue. There are also green cells that you can use to show your work (particularly if you aren't using excel formulas). All other cells are locked and cannot be editted.
Costs
Requirement 1
1. Identify the following as either a product cost or a period cost, and
2. Select the appropriate product cost category, or select expense. Student calculations / notes area
Description Cost Classification Category
Coconut flakes used in the cookies.
Depreciation on the ovens.
Wages for the bakery security guard.
Salaries of the bakers who make the cookies.
Insurance on the computers used in the accounting office.
Electricity for the bakery.
Heating for the corporate headquarters.
Freight for shipping the cookies to customers.
Salary of the baking supervisor.
CEO Salary
Wages for the bakery janito
Wages for the corporate headquarters janito
Flour for the cookies
Packaging Materials for the cookies
COGM
Requirement 2: Complete the Schedule of Cost of Goods Manufactured. Requirement 3: Using the results from Requirement 2, calculate the cost per unit for goods manufactured assuming:
17000 units were manufactured.
Cost of Goods Manufactured
Schedule of Cost of Goods Manufactured Total Units Produced
Unit Product Cost
Student calculations / notes area
COGS
Requirement 4: Complete the Cost of Goods Sold schedule.
Schedule of Cost of Goods Sold
Student calculations / notes area
NerdzyCOGM
This is the first problem in a sequence of problems that you will see throughout the course for Nerdzy Computer Company, a manufacturer of personal computers and tablets. During its first month of manufacturing, Nerdzy Computer Company incu
ed the following manufacturing costs: Use the space below to prepare the COGM for Nerdzy Computer Company. Only enter information in the blue shaded cells.
Balances: Beg. Bal End Bal
Direct Materials $ 12,400 $ 9,552
WIP Inventory - 0 17,000
FG Inventory - 0 31,000
Other Information
DM Purchases $ 15,489
Plant Janitorial Services 2,405
Sales Salaries Expense 18,543
Delivery Expense 1,500
Sales Revenue 1,100,000
Utilities for Plant 45,806
Rent on Plant 6,569
Customer Service Hotline Costs 8,190
Direct Labor 189,415
Prepare a schedule of cost of goods manufactured for Nerdzy Computer Company for the month ended January 31, 2021.
Student calculations / notes area
data
Costs Category Labels for Statements Ilm
sm04!07!19
Product Direct materials (DM) Beg. DM
Period Direct labor (DL) Beginning Finished Goods Inventory
Expense Beginning Work-in-Process Inventory
Manufacturing overhead (MOH) Cost of Goods Available for Sale
Cost of Goods Manufactured
Cost of Goods Sold
Direct Labo
Direct Materials Used
DM Avail. For Use
End DM
Ending Finished Goods Inventory
Ending Work-in-Process Inventory
Manufacturing Overhead
Plant Janitorial Services
Purchases of DM
Rent on Plant
Total Manuf Overhead
Total Manufacturing Costs Incu
ed during Period
Total Manufacturing Costs to Account Fo
Utilities for Plant
CostsANS
Requirement 1
1. Identify the following as either a product cost or a period cost, and
2. Select the appropriate product cost category, or select expense.
Description Cost Classification Category
Coconut flakes used in the cookies. Product Direct materials (DM)
Author: Author:
A period cost will ALWAYS be an expense. A Product cost will NEVER be an expense.
Depreciation on the ovens. Product Manufacturing overhead (MOH)
Wages for the bakery security guard. Product Manufacturing overhead (MOH)
Salaries of the bakers who make the cookies. Product Direct labor (DL)
Insurance on the computers used in the accounting office. Period Expense
Electricity for the bakery. Product Manufacturing overhead (MOH)
Heating for the corporate headquarters. Period Expense
Freight for shipping the cookies to customers. Period Expense
Author: Author:
This one causes confusion sometimes. This is a period/expense because the freight is a cost of selling the good AFTER it is produced, not a cost of actually producing the good (this is describing freight out). Note that "Freight In" is a cost associated with getting materials required to produce a product, so it would be included as a DM cost.
Salary of the baking supervisor. Product Manufacturing overhead (MOH)
CEO Salary Period Expense
Wages for the bakery janitor Product Manufacturing overhead (MOH)
Wages for the corporate headquarters janitor Period Expense
Flour for the cookies Product Direct materials (DM)
Packaging Materials for the cookies Product
Author: Author:
See page 866 of the text for more help with the definitions of the costs associated with managerial accounting.
Author: Author:
A period cost will ALWAYS be an expense. A Product cost will NEVER be an expense. Direct materials (DM)
COGMANS
Requirement 2: Complete the Schedule of Cost of Goods Manufactured. Requirement 3: Using the results from Requirement 2, calculate the cost per unit for goods manufactured assuming:
17000 units were manufactured.
Browned Butter Bakery
Author: Author:
The process for how to prepare a COGM starts on page 872. Cost of Goods Manufactured $ 16,950
Schedule of Cost of Goods Manufactured Total Units Produced 17,000
Month Ended March 31, 2018 Unit Product Cost $ 1.00
Beginning Work-in-Process Inventory $ 1,800
Author: Author:
Data is pulled from the Instructions page.
Direct Materials Used $ 2,600
Direct Labor 3,200
Manufacturing Overhead 10,450
Total Manufacturing Costs Incu
ed during Period 16,250
Author: Author:
Sum of DM, DL & MOH
Total Manufacturing Costs to Account For 18,050
Ending Work-in-Process Inventory (1,100)
Author: Author:
Remember that this should be reported in the negative.
Author: Author:
The process for how to prepare a COGM starts on page 872.
Author: Author:
Data is pulled from the Instructions page. Cost of Goods Manufactured $ 16,950
COGSANS
Requirement 4: Complete the Cost of Goods Sold schedule.
Browned Butter Bakery
Author: Author:
See page 874 for more help.
Schedule of Cost of Goods Sold
Month ended March 31, 2021
Beginning Finished Goods Inventory $ 624
Author: Author:
Data can be found in Instructions sheet.
Cost of Goods Manufactured 16,950
Author: Author:
Pulled from COGM that was prepared in previous requirement.
Cost of Goods Available for Sale 17,574
Ending Finished Goods Inventory (1,196)
Author: Author:
Should be calculated with the product cost you determined in req 3.Â
Cost of Goods Sold $ 16,378
NerdzyCOGMANS
This is the first problem in a sequence of problems that you will see throughout the course for Nerdzy Computer Company, a manufacturer of personal computers and tablets. During its first month of manufacturing, Nerdzy Computer Company incu
ed the following manufacturing costs: Use the space below to prepare the COGM for Nerdzy Computer Company. Only enter information in the blue shaded cells.
Nerdzy Computer Company
Author: Author:
See page 873 for an example of a COGM
Schedule of Cost of Goods Manufactured
Month Ended January 31, 2021
Balances: Beg. Bal End Bal
Direct Materials $ 12,400 $ 9,552 Beginning Work-in-Process Inventory $ - 0
Author: Author:
This is the first month of operations, so there is no beginning inventory
WIP Inventory - 0 $ 17,000 Direct Materials Used
FG Inventory - 0 $ 31,000 Beg. DM $ 12,400
Purchases of DM 15,489
Other Information DM Avail. For Use 27,889
DM Purchases $ 15,489 End DM (9,552)
Plant Janitorial Services $ 2,405 Direct Materials Used $ 18,337
Sales Salaries Expense $ 18,543 Direct Labor 189,415
Delivery Expense $ 1,500 Manufacturing Overhead
Sales Revenue $ 1,100,000 Plant Janitorial Services 2,405
Utilities for Plant $ 45,806 Utilities for Plan 45,806
Rent on Plant $ 6,569 Rent on Plant 6,569
Customer Service Hotline Costs $ 8,190 Total Manuf Overhead 54,780
Direct Labor $ 189,415 Total Manufacturing Costs Incu
ed during Period 262,532
Total Manufacturing Costs to Account For 262,532
Ending Work-in-Process Inventory (17,000)
Prepare a schedule of cost of goods manufactured for Nerdzy Computer Company for the month ended January 31, 2021. Cost of Goods Manufactured $ 245,532
Grading Sheet
Page Co
ect Answer Student Answer Points Total Points Earned 2
Costs CostsANS C6 Product 0 0 Total Points Possible 95
Costs CostsANS E6 Direct materials (DM) 0 0 Grade 2.11%
Costs CostsANS C7 Product 0 0
Costs CostsANS E7 Manufacturing overhead (MOH) 0 0
Costs CostsANS C8 Product 0 0
Costs CostsANS E8 Manufacturing overhead (MOH) 0 0
Costs CostsANS C9 Product 0 0
Costs CostsANS E9 Direct labor (DL) 0 0
Costs CostsANS C10 Period 0 0
Costs CostsANS E10 Expense 0 0
Costs CostsANS C11 Product 0 0
Costs CostsANS E11 Manufacturing overhead (MOH) 0 0
Costs CostsANS C12 Period 0 0
Costs CostsANS E12 Expense 0 0
Costs CostsANS C13 Period 0 0
Costs CostsANS E13 Expense 0 0
Costs CostsANS C14 Product 0 0
Costs CostsANS E14 Manufacturing overhead (MOH) 0 0
Costs CostsANS C15 Period 0 0
Costs CostsANS E15 Expense 0 0
Costs CostsANS C16 Product 0 0
Costs CostsANS E16 Manufacturing overhead (MOH) 0 0
Costs CostsANS C17 Period 0 0
Costs CostsANS E17 Expense 0 0
Costs CostsANS C18 Product 0 0
Costs CostsANS E18 Direct materials (DM) 0 0
Costs CostsANS C19 Product 0 0
Costs CostsANS E19 Direct materials (DM) 0 0
COGM COGMANS B4 Browned Butter Bakery 0 0
COGM COGMANS B6 Month Ended March 31, 2018 0 0
COGM COGMANS B9 Beginning Work-in-Process Inventory 0 0
COGM COGMANS E9 1,800 0 0
COGM COGMANS B10 Direct Materials Used 0 0
COGM COGMANS D10 2,600 0 0
COGM COGMANS B11 Direct Labor 0 0
COGM COGMANS D11 3,200 0 0
COGM COGMANS b12 Manufacturing Overhead 0 0
COGM COGMANS d12 10,450 0 0
COGM COGMANS b13 Total Manufacturing Costs Incu
ed during Period 0 0
COGM COGMANS e13 16,250 0 0
COGM COGMANS b14 Total Manufacturing Costs to Account For 0 0
COGM COGMANS e14 18,050 0 0
COGM COGMANS b15 Ending Work-in-Process Inventory 0 0
COGM COGMANS e15 (1,100) 0 0
COGM COGMANS b16 Cost of Goods Manufactured 0 0
COGM COGMANS e16 16,950 0 0
COGM COGMANS h4 16,950 0 0
COGM COGMANS h5 17,000 0 0
COGM COGMANS h6 1 0 0
COGS COGSANS b3 Browned Butter Bakery 0 0
COGS COGSANS b4 Schedule of Cost of Goods Sold Schedule of Cost of Goods Sold 1
COGS COGSANS b7 Beginning Finished Goods Inventory 0 0
COGS COGSANS d7 624 0 0
COGS COGSANS b8 Cost of Goods Manufactured 0 0
COGS COGSANS d8 16,950 0 0
COGS COGSANS b9 Cost of Goods Available for Sale 0 0
COGS COGSANS d9 17,574 0 0
COGS COGSANS b10 Ending Finished Goods Inventory 0 0
COGS COGSANS d10 (1,196) 0 0
COGS COGSANS b11 Cost of Goods Sold 0 0
COGS COGSANS d11 16,378 0 0
NerdzyCOGM NerdzyCOGMANS e4 Nerdzy Computer Company 0 0
NerdzyCOGM NerdzyCOGMANS e5 Schedule of Cost of Goods Manufactured 0 0
NerdzyCOGM NerdzyCOGMANS e6 Month Ended January 31, 2021 0 0
NerdzyCOGM NerdzyCOGMANS e8 Beginning Work-in-Process Inventory 0 0