6.0 Assessment Tasks
Assessment Task 1:
Assessment Task Analyse Business Requirements
Outcomes Assessed
Performance Criteria:
1.1, 1.2, 1.3
Addresses some elements of performance evidence and
knowledge evidence as shown in the Assessment Matrix
Description:
This is a scenario‐based task that simulates a real‐life business situation. As you will be working in a classroom and
lab environment, you will be provided with a business background/profile to develop the required business context.
For simulation purpose, you will play the role of a Network Analyst working for an IT consulting firm. Your
traine
assessor will play the role of the client where required and provide you with the required information and
feedback.
Your cu
ent institute/college is provided as the case organisation. Use the following information for your reference;
Business Scenario:
ALTEC is a Registered Training Organisation providing a range of vocation and higher education courses to local and
international students. ALTEC’s campus is spanned over two floors of a modern St Kilda Road building, and used by
approximately 800 students and 40 staff members.
ALTEC has two dedicated wired networks for administrative/academic and student services respectively. Print, scan,
email, and internet services are shared across the networks. The college uses its own intranet as a communications
channel, content repository, and an application sharing tool that supports day‐to‐day college activities. The college
uses separate email/data, file and print, database, and legacy servers.
With a view to expand its educational services in higher education, ALTEC has decided to add an additional floor to
its existing campus (ground and first floor). An entire second floor has been leased; and is being fitted out for
academic operations. There are also plans to use a part of the floor as an administrative area. With a view to
segregate its academic operations, ALTEC’s plan for the campus is;
Vocational Course
Ground and First Floor
Higher Education Courses
Second Floor
As the new floor will need to be connected with the existing network, the college has hired services of Bytes
Consultancy to plan and upgrade its existing network. In particular, the college requires that;
1. Two core backbones separating staff and student/visitor access and traffic
2. Different access levels and services across different floors
3. Integrated voice, video, network management, and routing traffic (over VPN)
4. User and department‐based control lists and traffic shaping
ICTNWK529 Install and Manage Complex ICT Networks
Trainer’s Guide | V 4.0 | April 2018 | Page 2 of 6
Pass Global Pty Ltd t/a ALTEC College | RTO Code 22034 | CRICOS Code 02926D
Approved by: Academic Manager | Next Review: April 2019
5. An out–of–band network to access and manage the devices
6. Three distinct connection layers of;
a. Student Administration
. Internet
c. Remote Access
7. Future scalability to an enterprise WAN
You have been given the task to conduct a meeting with the client (traine
assessor role‐play) and confirm the
organisational requirements.
Task
1. Conduct a meeting with the client and confirm specific requirements, including information about the cu
ent
network infrastructure
2. Draw a cu
ent network diagram and identify existing network components
3. Research and develop a solution for the new requirements
4. Draw a proposed physical network topology diagram
5. Draw a proposed logical network topology diagram
6. Briefly explain how the proposed design will meet business requirements
The document should be word‐processed and written as a formal business document with appropriate section
headings and references. Ensure that you maintain effective communication and consultation with the client
(traine
assessor role play).
Word Limit: Maximum four (4) single‐spaced, double‐sided A4 sheets
Assessment Criteria
The following assessment criteria will be used for marking this assessment task. Ensure that you have addressed all
of the criteria in your work;
Addressed all the requirements of the task
Maintained effective communication and confirmed client
usiness requirements within the given role play
Reviewed existing network infrastructure and identified all the key components/devices
Provided a map of existing network
The map represents realistic/accurate representation of the cu
ent college network
Researched and proposed new network hierarchy model to meet the new requirements
An appropriate network topology design/method is used to show physical and logical network topologies
Network diagrams are clear, labelled and accurately show logical and physical connections
Appropriate graphical references/illustrations are used to show various network devices and components
Network layers are clearly and appropriately shown
The proposed network design is realistic and supported by external references/models (e.g. CISCO)
Described how the proposed integrated services will be delivered
Presented the proposed solution in a coherent and an appropriately structured document
Compatibility issue with the cu
ent network is evaluated and addressed through product/vendor
information and data
Submission Guidelines
Submit:
Written planning document
Network diagrams
Reference/vendor documents and/or links
Electronic versions of the assessment task and email/electronic submission a
angements are at further discretion
of the traine
assessor.
Note: Keep a copy of all your work/documents as you may need them in the subsequent tasks.
ICTNWK529 Install and Manage Complex ICT Networks
Trainer’s Guide | V 4.0 | April 2018 | Page 3 of 6
Pass Global Pty Ltd t/a ALTEC College | RTO Code 22034 | CRICOS Code 02926D
Approved by: Academic Manager | Next Review: April 2019
Assessment Task 2:
Assessment Task Develop an Implementation Plan
Outcomes Assessed
Performance Criteria:
1.3, 2.1, 2.2, 2.4, 2.5, 6.1
Addresses some elements of performance evidence and
knowledge evidence as shown in the Assessment Matrix
Description:
Continuing in the same role as in the previous assessment task, assume that the solutions proposed by you have
een accepted and you have been asked to develop an implementation plan for installation of the required network
at the college.
An implementation plan lists all the tools
esources required for installation and identifies/outlines key tasks in a
step‐by‐step format within the given time frame.
Using your network plan created in Assessment Task 1, develop an implementation plan for ALTEC for installation of
the new network. Your plan will include;
Background/Context (why the plan is being prepared)
Site requirements/assumptions
Tools and resources required
Network management tools (network admin and monitoring)
Implementation tasks
Security requirements
Security strategy
Security tools and methods for ongoing monitoring
The implementation plan should be word‐processed and written as a formal business document with appropriate
section headings and references. Ensure that you maintain effective communication and consultation with the client
(traine
assessor role play).
Word Limit: Maximum four (4) single‐spaced, double‐sided A4 sheets
External sources should be cited using an appropriate referencing system and listed as references at the back of the
document.
Assessment Criteria
The following assessment criteria will be used for marking this assessment task. Ensure that you have addressed all
of the criteria in your work;
Addressed all the requirements of the task
Completed the task within the given business context and the required role‐play
Maintained effective communication and consultation throughout
Demonstrated the required planning, organisation, and communication skills within the context of this task
Outlined the business need/case for implementation of new services
The implementation plan is appropriately structured and covers all the required information
Network resources are identified and listed
ICTNWK529 Install and Manage Complex ICT Networks
Trainer’s Guide | V 4.0 | April 2018 | Page 4 of 6
Pass Global Pty Ltd t/a ALTEC College | RTO Code 22034 | CRICOS Code 02926D
Approved by: Academic Manager | Next Review: April 2019
Adequate assumption for pre‐installation site conditions and installation support are made based on the
cu
ent site (college building)
Implementation tasks are
oken down in key steps from unpacking the equipment to installation and
testing
Vendor specifications and requirements for installation of various devices are analysed and outlined
Provided references/guides/links to vendor or other external sources for key tasks
Network administration tasks and methods are outlined
Appropriate network management tool/software is recommended for monitoring network performance
Potential internal and external security threats are identified and described for the college’s network
Risk mitigation strategies are devised to eliminate/minimise security threats
Reference documents and links are provided for additional network security information
Appropriate security tools/software are recommended for continuously monitoring network security
External sources are acknowledged and cited using a referencing convention
Submission Guidelines
Submit:
Written Implementation Plan
Reference/vendor documents and/or links
Electronic versions of the assessment task and email/electronic submission a
angements are at further discretion
of the traine
assessor.
Note: Keep a copy of all your work/documents as you may need them in the subsequent tasks.
ICTNWK529 Install and Manage Complex ICT Networks
Trainer’s Guide | V 4.0 | April 2018 | Page 5 of 6
Pass Global Pty Ltd t/a ALTEC College | RTO Code 22034 | CRICOS Code 02926D
Approved by: Academic Manager | Next Review: April 2019
Assessment Task 3:
Assessment Task Install, Configure and Test a Complex Network
Outcomes Assessed
Performance Criteria:
2.3, 3.1, 3.2, 3.3, 3.4, 3.5, 3.6, 4.1, 4.2, 4.3, 4.4, 5.1, 5.2, 5.3, 6.2,
6.3, 6.5, 6.6, 6.7, 6.8, 7.1