Four print jobs need to be completed at a university print shop, and five machines are available for assignment to these jobs. Each machine can be assigned to at most one job. The time required (in...

1 answer below »

Four print jobs need to be completed at a university print shop, and five machines are available for assignment to these jobs. Each machine can be assigned to at most one job. The time required (in minutes) for each machine to complete each job is given below. Formulate and solve a linear program or network model to determine an assignment of machines to jobs that minimizes the time needed to complete the jobs.

Answered 134 days After May 19, 2022

Solution

Bikash answered on Sep 30 2022
60 Votes
Sheet1
    Objective Function (Minimize total time taken)                            15
            Job 1    Job 2    Job 3    Job 4                    Time    Job 1    Job 2    Job 3    Job 4
        Machine 1    1    0    0    0    1    =    1        Machine 1    2    5    8    9
        Machine 2    0    0    0    1    1    =    1        Machine 2    8    12    6    5
        Machine 3    0    0    0    0    0    =    1        Machine 3    5    8    11    7
        Machine...