Great Deal! Get Instant $10 FREE in Account on First Order + 10% Cashback on Every Order Order Now

Design a VCP lateral sewer for the Village of Waffle (Figure P XXXXXXXXXXby preparing a sewer design table similar to that shown in Example 19-2 and a profile drawing similar to Figure 19-13b. The...

1 answer below »

Design a VCP lateral sewer for the Village of Waffle (Figure P XXXXXXXXXXby preparing a sewer design table similar to that shown in Example 19-2 and a profile drawing similar to Figure 19-13b. The sewer will be beside Bacon Road and Eggs Road starting at Pancake Road and ending at State Road. Mark and number the manhole locations on a copy of Figure P17-24 in Chapter 17. The sewer design is to terminate at an inverted siphon that will carry the sewage under the Syrup River to a lift station. Use the following assumptions: wastewater production is equal to water demand and is the same as that given in Problem 17-24; peaking factor for peak hourly flow is 6.2; I/I is 40 L/d ⋅ mm ⋅ km. Interpolate linearly between contour lines to estimate elevations of the ground surface. This problem does not include the design of the siphon or the lift station.

Answered 11 days After May 03, 2022

Solution

Amit answered on May 14 2022
105 Votes
Title of the assignment:
Student’s name:
Student ID:
Professor’s name:
Course title:
Date: 5/14/2022
Table of Contents
1.    Answer    3
2.    References:    5
1. Answe
The "Village of Waffle" is maintaining high population and it is regularly growing, thus, the water demand will also be high. This will make requirement of designing a proper system of pipes or lateral sewer on bases of the provided figures and hourly flow so that water supply can be maintained for this village in an...
SOLUTION.PDF

Answer To This Question Is Available To Download

Related Questions & Answers

More Questions »

Submit New Assignment

Copy and Paste Your Assignment Here